Here are time sequence photos of the construction of the aviary for the Cherryheads (Numbered image sequence starts on left, down, across, up and back)
The safe entry doorway was constructed but it was too late (dark) to get a good photo.
The entire project took about 8 hours not including a run to get some additional supplies
"Cherryhead Kids' Mansion (03Sept2009)"
|
|
|
|
|
(7) Inside view of protected area from aviary doorway
|
(6) Detail of safe entry and aviary door from other side
|
(5) Safe entry attached; protected area completed
|
(4) Final modifications to attach safe entry to aviary door
|
|
|
|
|
(3) Basic aviary complete
|
(2) Safe entry completed; starting on floor and one side
|
(1) Safe entry under construction (2 sides completed)
|
|